AltaCoin Projects
Ten real projects in global infrastructure – ports, docks, inland freight points, water, and energy across the Canadian North and its northern gateways – from northern unused infrastructure reactivation to a giga-scale inland port. Ten projects, $834,490,000 combined value – with the full ladder in one place. Involvement in a project means participating in the project and sharing in its actual net revenue — the Participant Pool is 10% of each project’s net revenue, distributed monthly among qualifying participants. It is not a yield on ALC and no return is promised.
Each project has a participation gate: hold ALC worth 1% of the project’s value (in CAD). The gate is a balance check only — nothing is spent, transferred, or locked, ever. Holds stack: your balance must cover the sum of the gates of every project you join. Involvement stays active only while your wallet is connected and the hold is met; if the balance drops or the wallet disconnects, involvement suspends and resumes automatically when the hold is restored.
Need ALC? Buy ALC on XMarkets · Mine ALC on Omnichain
Northern Unused Infrastructure Reactivation — First Sites T1 Bootstrap
The North is full of infrastructure that was built, used, and left standing — docks, warehouses, fuel pads, airstrip buildings, transfer yards — sound structures idle because no one holds the survey, the condition report, or the reactivation costing in one place. This project does that first work: it inventories unused northern infrastructure site by site, verifies condition on the ground, costs the return to service, and brings the first small sites back into work. Every later project on this ladder starts from this registry — it is the slate's foundation on purpose.
| Project value | $30,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First 10 sites surveyed and in the registry; |
| Participation gate | Hold $300 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: The project operates the registry and the reactivation service: condition surveys and reactivation costings under contract to the communities, municipalities, and agencies that own the sites, plus a standing registry service for operators looking for northern capacity. Revenue = survey and costing contract fees and registry service fees. Costs are survey travel, inspection, and registry upkeep, recorded per site in the project ledger.
What involvement gets you: the pool share; the registry itself as it grows (sites surveyed, condition, reactivation cost, status); first notice of reactivation sites opening to the slate's larger projects.
Milestones: First 10 sites surveyed and in the registry; · first 3 reactivation costings delivered to owners; · first unused site returned to service; · registry covering the slate's three port regions (Churchill, Prince Rupert, Tuktoyaktuk corridors).
Knowledge-building: the reactivation registry is the asset — per-site condition reports, photographs, reactivation costings, and the northern infrastructure field guide the survey crews write from the first season's sites, all maintained as ERP records participants can study.
Involvement actions: participants nominate unused sites in their own communities for the survey queue; join the annual registry review where sites are ranked for reactivation; local participants act as site contacts for survey crews.
Reporting: quarterly registry report from the ERP ledger — sites surveyed, sites costed, sites returned to service, contract revenue and costs per site.
Status: Launched 2026-11-16 (owner) — design stage.
Truck Transport Transfer Centre — Community Pilot T1 Bootstrap
Where the highway ends and the smaller roads, winter roads, and local hauls begin, freight changes trucks — usually in an open yard, in the weather, with no record of what was handed to whom. This project builds the first proper small transfer centre: a graded and drained pad, a heated transfer shelter, container and pallet handling gear, lighting, and a check-in/check-out record for every load that crosses it, run through the ERP. It is the inland-port idea at its smallest working scale, and the template the larger transfer centres on this ladder are copied from.
| Project value | $45,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Pad and shelter built, handling gear in place; |
| Participation gate | Hold $450 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: The centre operates the transfer service: scheduled transfer windows for carriers and local haulers, short-stay staging, and freight consolidation for community deliveries. Revenue = per-transfer handling fees, staging fees, and consolidation service fees paid by carriers and shippers. Costs are pad and shelter upkeep, handling labour, and equipment, recorded in the project ledger.
What involvement gets you: the pool share; transfer reporting (loads transferred, dwell time, damage claims — the numbers that show whether the centre earns its place); a booked transfer window for a holder's own freight at centre rates.
Milestones: Pad and shelter built, handling gear in place; · first carriers on scheduled transfer windows; · first winter-road season run on the centre's records; · operating manual and cost book published from a full season, ready to replicate.
Knowledge-building: the transfer-centre operating manual written from the pilot — pad layout, transfer windows, chain-of-custody records, winter operating practice — plus the centre's cost book (cost per transfer, per pallet, per day) kept current in the ERP.
Involvement actions: participants who haul or ship book and review transfer windows; local participants join the seasonal readiness check (pad, shelter, gear) before the winter-road season; participants flag freight that missed its connection for the centre's exception log.
Reporting: monthly operating report from the ERP ledger — transfers handled, revenue and costs, dwell-time average, exceptions and claims.
Status: Launched 2026-11-16 (owner) — design stage.
Rail Dock & Siding Loading Service T2 Startup
Rail reaches places in the North that roads reach late or never, but a siding is not a dock: without a loading platform, handling equipment, and someone accountable for the carload, northern freight sits. This project builds and operates a rail dock at a northern siding — platform, forklift and loader, secure staging, and carload check-in/check-out in the ERP — so producers and suppliers can load and receive by rail the way southern shippers take for granted.
| Project value | $120,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Platform and equipment in place, railway coordination agreed; |
| Participation gate | Hold $1,200 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: The service operates the dock: carload loading and unloading, staging, and first/last-mile coordination with local haulers. Revenue = per-carload handling fees, staging fees, and coordination fees paid by shippers and receivers. Costs are equipment, platform upkeep, and handling labour, recorded per carload in the project ledger.
What involvement gets you: the pool share; carload reporting (cars handled, commodities, turnaround time); a loading slot for a holder's own carload freight at service rates.
Milestones: Platform and equipment in place, railway coordination agreed; · first 25 carloads handled; · standing weekly loading window through a full season; · second commodity line (beyond the anchor shipper) moving regularly.
Knowledge-building: the rail-dock operations handbook — carload handling practice, securing and inspection checklists, siding coordination with the railway — and the commodity book the dock builds season by season (what moves, when, in what volumes), kept in the ERP.
Involvement actions: shipping participants book loading slots and confirm carload contents into the ERP record before arrival; local participants join the pre-season siding inspection; participants report carload condition on receipt into the dock's record.
Reporting: monthly operating report from the ERP ledger — carloads handled, turnaround, revenue and costs per carload, claims and exceptions.
Status: Launched 2026-11-16 (owner) — design stage.
Airport Freight Centre — Regional Northern Airport T2 Startup
For fly-in and seasonally road-cut communities, the airport is the port — and air freight is usually handled out of a corner of the terminal, unweighed, unrecorded, and last in line. This project builds a proper airport freight centre at a regional northern airport: a cargo shed with cold and secure storage, weigh and manifest handling, and a freight record per shipment in the ERP, so a community's food, parts, and medical freight moves with the same discipline a seaport gives a container.
| Project value | $225,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Cargo shed fitted with cold and secure storage, handling live; |
| Participation gate | Hold $2,250 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: The centre operates air-freight handling for carriers, shippers, and community resupply programs: receiving, weighing, manifesting, cold/secure holding, and release. Revenue = per-kilogram handling fees, storage fees, and resupply-program handling contracts. Costs are shed operations, cold storage, and handling staff, recorded per shipment class in the project ledger.
What involvement gets you: the pool share; freight reporting (tonnes handled, cold-chain integrity, missed-connection rate); priority handling for a holder's own air freight at centre rates.
Milestones: Cargo shed fitted with cold and secure storage, handling live; · first resupply-program contract handled end-to-end; · full winter season run on centre records; · second airport scoped from the route book.
Knowledge-building: the air-freight operations guide for northern airports — manifest discipline, cold-chain practice for perishables on northern routes, dangerous-goods basics for handlers — and the centre's route book (volumes by community and season), maintained in the ERP.
Involvement actions: participants shipping north book freight through the centre and confirm manifests in the ERP; community participants serve as receiving contacts, confirming arrival condition; participants join the annual cold-chain audit of the centre's records.
Reporting: monthly operating report from the ERP ledger — tonnes and shipments handled, revenue and costs, cold-chain exceptions, missed connections.
Status: Launched 2026-11-16 (owner) — design stage.
Tuktoyaktuk Dock & Seasonal Resupply Berth T3 Growth
Tuktoyaktuk is Canada's Arctic Ocean port community at the end of the Inuvik–Tuktoyaktuk Highway — road-connected year-round, sea-supplied in the short open-water season, and served by dock infrastructure that has never matched either role. This project builds the working berth: dock face repair and strengthening, a freight staging apron, handling equipment, and a sealift receiving operation run on ERP records, so the community's annual resupply — fuel, food, building material, vehicles — lands on a schedule with a manifest, not on a beach with a loader and a hope.
| Project value | $550,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Dock condition survey and berth design from the Project 1 registry; |
| Participation gate | Hold $5,500 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: The project operates the berth and the seasonal resupply receiving service: berthage, unloading, staging, and delivery coordination for sealift and barge operators and community resupply programs; off-season, the apron and equipment serve highway freight and community works. Revenue = berthage and handling fees, staging fees, and resupply-program service contracts. Costs are dock maintenance, equipment, and the seasonal crew, recorded in the project ledger.
What involvement gets you: the pool share; sealift reporting (lifts received, tonnage, schedule kept); a staging slot for a holder's own northern freight in season.
Milestones: Dock condition survey and berth design from the Project 1 registry; · berth works and staging apron complete, equipment on site; · first full sealift season received on ERP records; · second season at contracted volumes with the cost book published.
Knowledge-building: the Arctic berth operations record — ice and season calendars, sealift receiving practice, dock inspection reports — and the community resupply cost book (cost per tonne landed, per season), maintained in the ERP as the reference for every Arctic berth that follows.
Involvement actions: community participants join the pre-season dock inspection and the sealift receiving crew roster; shipping participants lodge manifests in the ERP before sailing; participants review the post-season report and flag cargo losses or damage into the record.
Reporting: monthly in season, quarterly off-season, from the ERP ledger — lifts and tonnage, berth revenue and costs, schedule performance, condition items carried forward.
Status: Launched 2026-11-16 (owner) — design stage.
Prince Rupert Dock Reactivation & Freight Berth T3 Growth
Prince Rupert is the continent's northern Pacific gateway — deep water, rail-served, a day closer to Asia than any other west-coast port — and around its major terminals sit underused docks and berths that smaller freight, coastal shipping, and project cargo cannot reach through the big terminals' queues. This project reactivates one: an unused dock brought back into service as a working freight berth for coastal and project cargo, with berth bookings, cargo records, and rail coordination run in the ERP.
| Project value | $920,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Dock selected from the registry, condition and works plan agreed; |
| Participation gate | Hold $9,200 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: The project operates the reactivated berth: berthing, loading and unloading for coastal vessels and project cargo, laydown and staging, and rail-transfer coordination. Revenue = berthage and handling fees, staging and laydown fees, and standing service agreements with coastal carriers. Costs are the reactivation works, berth operations, and equipment, recorded per vessel call in the project ledger.
What involvement gets you: the pool share; berth reporting (vessel calls, tonnage, berth occupancy); priority berth windows for a holder's own coastal freight.
Milestones: Dock selected from the registry, condition and works plan agreed; · reactivation works complete, berth certified for service; · first coastal carrier on a standing agreement; · berth occupancy above 60% across a full season.
Knowledge-building: the dock reactivation dossier — the engineering condition record, the works log, and the operating cost history of returning an unused berth to service — plus the coastal cargo guide the berth publishes for small shippers (booking, documentation, rail transfer), all kept in the ERP.
Involvement actions: shipping participants book berth windows and file cargo documentation through the ERP; participants with unused coastal infrastructure nominate it into the Project 1 registry from this berth's dossier as the worked example; local participants join the annual berth condition walk.
Reporting: monthly operating report from the ERP ledger — vessel calls, tonnage, occupancy, revenue and costs, works and condition items.
Status: Launched 2026-11-16 (owner) — design stage.
Churchill Dock & Port Works T4 Established
Churchill is Canada's only Arctic deep-water port with a rail line to the south — Hudson Bay's door — and its dock works decide whether northern trade, community resupply, and prairie exports through the Bay grow or stall. This project builds the dock program: berth and fender works, cargo-handling capacity, and a port operations record in the ERP covering every vessel, every cargo, and every season, so the port's short ice-free window is planned like the scarce asset it is.
| Project value | $3,600,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Dock condition and works program agreed from survey; |
| Participation gate | Hold $36,000 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: The project delivers and operates the dock works and the port services around them: berthing and cargo handling for resupply, project cargo, and bulk programs; staging and storage; season planning with carriers and the railway. Revenue = berthage and handling fees, storage and staging fees, and port service contracts. Costs are the works program, seasonal operations, and maintenance, recorded per season in the project ledger.
What involvement gets you: the pool share; season reporting (vessels, tonnage by cargo class, window utilization); briefings before each season's program is committed, with the prior season's record in hand.
Milestones: Dock condition and works program agreed from survey; · first works package (berth and fenders) delivered; · first full season operated on the ERP port record; · cargo-handling capacity expansion committed on two seasons of records.
Knowledge-building: the Hudson Bay port operations library — season calendars and ice records, berth works engineering files, cargo-handling practice for a short-window Arctic port — and the port's published season cost book, maintained in the ERP as the program's institutional memory.
Involvement actions: shipping and resupply participants lodge season cargo programs in the ERP before the window opens; participants join the post-season review where the next season's works list is set; northern community participants serve as the port's resupply liaison contacts.
Reporting: monthly in season from the ERP ledger, plus a full season report each fall — vessels and tonnage, works delivered, revenue and costs, window utilization, works carried forward.
Status: Launched 2026-11-16 (owner) — design stage.
Seawater Desalination — Regional Coastal Plants T5 Large
Northern coastal communities sit beside an ocean they cannot drink: water comes from short-season lakes, aging treatment plants, and boil-water advisories that last for years. This project installs seawater desalination where the sea is the reliable source — modular plants sized to the community, at coastal sites on the Pacific, Hudson Bay, and Arctic coasts — and operates them under long-term water supply arrangements, with production, quality, and cost records in the ERP per plant. The sea is the one northern water source that never runs dry in August or freezes out of reach in January; this program treats it that way.
| Project value | $19,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First plant site and water supply contract agreed; |
| Participation gate | Hold $190,000 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: The project builds and operates the plants: intake and desalination units, treated-water storage, and distribution tie-ins, under water supply contracts with communities and utilities, plus industrial supply (port and plant operations) where a plant has spare capacity. Revenue = contracted water supply fees per cubic metre delivered and industrial supply contracts. Costs are energy, membranes and consumables, operators, and maintenance, recorded per plant in the project ledger.
What involvement gets you: the pool share; per-plant production and water-quality reporting; a plant assessment for a coastal community a holder serves, on the program's standard terms.
Milestones: First plant site and water supply contract agreed; · first plant commissioned and in contracted supply; · three plants operating across two coasts; · program cost book published from a full year of plant records, next round of sites committed.
Knowledge-building: the desalination operating library — plant sizing and intake practice for northern coasts, water-quality records per plant, operator training materials, and the cost-per-cubic-metre book by site and season — maintained in the ERP so each next plant is designed from the running plants' evidence.
Involvement actions: community participants sit on each plant's local water committee and receive its quality record first; operator trainees from host communities train on the running plants; participants review the annual cost book and flag sites for the next plant round.
Reporting: monthly per-plant operating report from the ERP ledger — cubic metres produced, quality results, revenue and cost per cubic metre, downtime and maintenance.
Status: Launched 2026-11-16 (owner) — design stage.
Northern Energy Program — Molten Salt Generation & LNG Supply T6 Mega
Northern energy runs on flown- and barged-in diesel — the most expensive electricity and heat in the country, priced by the litre and the sealift. This program builds the replacement at program scale, in two workstreams staged on their own records: molten salt generation — modular molten-salt thermal generation and storage units giving northern grids and industrial sites dispatchable power and heat that does not arrive by barge — and LNG supply — receiving, storage, and distribution that lets communities and industry switch heating and generation from diesel to gas at northern scale. Ports, mines, and communities on this slate's other projects are its first customers; the ERP is the program's record, workstream by workstream.
| Project value | $160,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First sites and anchor supply contracts agreed for both workstreams; |
| Participation gate | Hold $1,600,000 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: The program builds and operates both workstreams under long-term supply contracts: molten salt units under power-and-heat supply agreements with grids, ports, and industrial sites; LNG facilities under fuel supply agreements with communities, carriers, and industry. Revenue = contracted energy and heat sales, LNG supply and storage fees. Costs are units and facilities, fuel and consumables, operators, and maintenance, recorded per workstream and per site in the project ledger. Each workstream phase operates and reports before the next is committed.
What involvement gets you: the pool share across both workstreams; phase-gate reporting (capacity in service, energy delivered, diesel displaced at each site); briefings before each phase commitment, with the operating record of the phases already running.
Milestones: First sites and anchor supply contracts agreed for both workstreams; · first molten salt unit in contracted service; · first LNG facility in contracted supply; · second-round sites committed on the first sites' delivered-cost records.
Knowledge-building: the northern energy library — molten salt unit operating records and maintenance practice, LNG handling and safety documentation for northern sites, and the delivered-cost book (cost per kWh and per gigajoule by site, against the diesel baseline it replaces) — maintained in the ERP from the first unit's first month.
Involvement actions: host-community and industrial participants sit on site selection reviews with the delivered-cost book in hand; local operators train and certify on the running units and facilities; participants join the annual diesel-displacement audit of the program's records.
Reporting: monthly operating report per workstream from the ERP ledger — capacity in service, energy and fuel delivered, revenue and costs, diesel displaced; a full program report annually.
Status: Launched 2026-11-16 (owner) — design stage.
Alberta Inland Port & Rail-Served Industrial Park T7 Giga
Alberta's trade geography has one structural gap: no inland port of its own, where rail, highway, serviced industrial land, and customs-adjacent logistics meet in one place under Alberta's own flag. This program builds it in stages over a decade — rail spur and intermodal terminal first, then serviced industrial lots released stage by stage as tenants commit — so the province's producers ship finished goods out and bring inputs in on Alberta infrastructure. The ERP is the program's public registry: stages, servicing, tenancy, and throughput, reported in the open for the program's life.
| Project value | $650,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Land assembly and rail agreement framework signed; |
| Participation gate | Hold $6,500,000 CAD ALC — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: Revenue = intermodal terminal handling fees, serviced-land sales and ground leases to industrial tenants, and warehousing operations on the park. Each stage is financed and reported inside the one program record; no stage proceeds on the promise of a later one.
What involvement gets you: the pool share across program stages; stage-gate reporting in full operational detail; a permanent place in the program's participant registry as stages come online over the build-out.
Milestones: Land assembly and rail agreement framework signed; · Stage 1 (rail spur + intermodal terminal) built and handling freight; · first industrial tenants operating on serviced lots; · Stage 2 land release committed on Stage 1 throughput.
Knowledge-building: the program registry and stage library — land assembly and rail agreement records, servicing designs per stage, tenancy and throughput records — maintained in the ERP as the public record of how an inland port gets built, stage by stage.
Involvement actions: participants receive and review each stage-gate package before a stage is committed; tenant and shipper participants lodge throughput and servicing requirements into the program record; participants hold their place in the participant registry across the build-out.
Reporting: stage-gate reporting in full operational detail from the ERP ledger, with monthly operating reports once Stage 1 is handling freight — stages, servicing, tenancy, throughput, revenue and costs.
Status: Launched 2026-11-16 (owner) — design stage.
Projects across the fleet: Aediles · AltaCoin · AquaCoin · CattleChain · CCJV Core Projects · Cibus · Citizen James · Constructum · DatumChain · Defensio · Educatio · Empowerment · Energychain · Impensa · Industria · Ingenium · IterCoin · Landbank · LexCoin · Manufactura · Pecunia · Plasticus · QCNWealth · Qingcoin · Sanitas · Workers First